Architect's rendering of the proposed development. [*] |
Construction was to begin in September of 2010, but the discovery of an underground utility box further delayed construction. Today we get word that a three-story mixed use development will be built at the location. Architectural renderings indicate a structure with a design similar to that of the modern Main+Rose, yet a small green area (with public art?) will be left for the easternmost (and prominent) corner. And a parking structure is proposed as well, eliminating the debate (for this site) about the overabundance of surface lots which reduce Lexington's urban density.
I'll look forward to seeing more information about this development, though I remain concerned about the introduction of two floors of office space when we already have a significant amount of vacant commercial square footage throughout Lexington (including downtown).
Comments